Project preparation for the reconstruction and modernisation of the high-rise building, which was poetically called the Black Pearl at the time of its construction (1960 - 1969), began almost ten years ago. During that time, not only the owners of the building in Ostrava-Poruba changed, but also the purpose of its new use.
The turning point came in 2021, when the new owners launched a tender for the selection of a general contractor for the reconstruction. This began in spring 2022 with the dismantling of the existing envelope. Our company Clearmont was selected as the supplier of the modern envelope, which was to preserve the original character of the façade, but in a material and functional design that met current standards.